Second floor east bedroom wall leaking, through the wall, at the base and under the wooden tiles, 3/13

journal > 2019 > April - Andrew visits > Second floor east bedroom wall leaking, through the wall, at the base and under the wooden tiles, 3/13

April - Andrew visits DSC_1643

Second floor east bedroom wall leaking, through the wall, at the base and under the wooden tiles, 3/13

Keywords: home
Camera/lens: NIKON D7000, 17-50mm f/2.8
Aperture: 5.6, Shutter speed: 1/125, Focal length: 22.0 mm, ISO: 200, Bias: 0
Date/Time: 2019:03:13 10:54:44
Average color: gray62